Serving Davie, Plantation, Cooper City & Broward County — (954) 715-2452

Accordion Hurricane Shutters in Davie, FL

The most popular hurricane protection for Davie homeowners. Permanently mounted, deploys in under an hour, costs about half of motorized roll-down systems.

Get Your Free Quote

How Accordion Shutters Work

Accordion shutters are vertical slats joined together that fold open and closed like a fan. When not in use, they sit folded against the side of each window or door in their own housing, typically painted to match your home's trim. When a storm approaches, you unfold each set, slide them across the opening, and lock them in place.

A homeowner with average mobility can deploy a full set of accordion shutters across a typical Davie home in 30 to 60 minutes. No ladders. No stored panels. No tools.

Why Davie Homeowners Choose Accordion Shutters

Always There

Unlike panel shutters, you don't need storage space or ladders. They live on your home year-round.

Lock in Seconds

A child can latch them. Popular with retirees in Pine Island Ridge, Forest Ridge, and similar Davie HOA communities.

Affordable

Roughly half the cost of motorized roll-down shutters while providing the same level of impact protection.

Modern Look

Over a dozen colors and slimmer profiles than the boxy units from the 1990s. We'll show you samples at the in-home measurement.

Accordion Shutter Pricing in Davie

Material and labor combined: $25 to $45 per square foot of opening covered.

Home SizePrice Range
Small (<1,500 sq ft)$4,500 – $7,500
Mid-size (1,800–2,800 sq ft)$7,500 – $13,000
Large (3,000+ sq ft)$13,000 – $22,000

We've installed accordion systems in Pine Island Ridge condos for as low as $3,200, and in Imagination Farms estates for as high as $34,000.

Brands We Install

Eastern Metal Supply, Roll-A-Way, and Astro Shutters — all Miami-Dade NOA approved and rated for the High Velocity Hurricane Zone.

Permitting and Timeline

After you sign a contract: permit application submitted (day 1–2), permit approved (day 7–14), installation (day 14–21, typically 2–3 days), final inspection (day 22–28). Total: 3 to 4 weeks. During peak hurricane season, timelines may extend.

Get Your Free Hurricane Shutter Quote

Free in-home measurement and written estimate. No obligation.

Request Quote Online